JAUE2014-015 Application of zone planning method at the prelim preliminary design phase
DOI:
https://doi.org/10.69457/aiue.20140015Keywords:
BIM, Build Live Japan, Dateconnection, Zone toolsAbstract
Our team have collected all the IFC files in BLJ.However, we got trouble in analysingsoftware or CAD fileswhen files spaceexceeded to 4GB.Thus we got trapped because of the large size of IFC files. To enhance the availability of thefilesin Building Environment Design, we’ll do some searching in narrowing IFC files to make thefiles can bein minimumsizing software.