JAUE2014-015 Application of zone planning method at the prelim preliminary design phase
DOI:
https://doi.org/10.69457/aiue.20140015Keywords:
BIM, Build Live Japan, Dateconnection, Zone toolsAbstract
Our team have collected all the IFC files in BLJ.However, we got trouble in analysingsoftware or CAD fileswhen files spaceexceeded to 4GB.Thus we got trapped because of the large size of IFC files. To enhance the availability of thefilesin Building Environment Design, we’ll do some searching in narrowing IFC files to make thefiles can bein minimumsizing software.
Downloads
Published
2025-08-25
Issue
Section
AIUE Journal
License
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution 4.0 International License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.